Project DC2 Integra- Getting More Grip With OS Giken and Better Response With Centerforce

,

Next, a new pilot bearing is tapped into the new Centerforce aluminum flywheel.

The dowel pins that index the pressure plate are tapped into place.

Howard applies Loctite blue to the flywheel to crank bolts.

The Centerforce aluminum flywheel is bolted down.

 

1 comment

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*