Then the OE master could be removed. Looks gross in that reservoir. Here you can see the nice Tilton master with the reservoir attached and the machined billet mounting plate that Joel Grannas provides. It nestles neatly into place and looks completely stock. Mark spent time on getting the Toyota pedal attached to the master — it would need quite a bit of adjustment later. Then we attached the braided Goodridge hose that Grannas includes so that we would be ready to connect the master to the HRB. Previous page 1 2 3 4 5 6Next pageRelated TopicsGrannas RacingSC3002JZFabricationRoad Race Cars1JZTransmissionClutch and FlywheelLexusMotor MountsTilton EngineeringTremec Transmissions Previous Article Corvette Stingray (C7 Z51) Chevrolet Projects WATCH: Project C7 Corvette RETURNS to Buttonwillow Raceway! Jeff Naeyaert View Post Next Article EVO IX Projects Mitsubishi Ignition system upgrade for the Mitsubishi EVO 8 / 9 – 4G63 engine. Mike Kojima View Post Leave a Reply Cancel replyYour email address will not be published. Required fields are marked *Comment * Name * Email * Website Save my name, email, and website in this browser for the next time I comment. Δ
Previous Article Corvette Stingray (C7 Z51) Chevrolet Projects WATCH: Project C7 Corvette RETURNS to Buttonwillow Raceway! Jeff Naeyaert View Post
Next Article EVO IX Projects Mitsubishi Ignition system upgrade for the Mitsubishi EVO 8 / 9 – 4G63 engine. Mike Kojima View Post