Project Evo X GSR, Completing the Suspension with Whiteline

,

After removing the retaining clip, the ball joint can be pressed out with no damage to anything. 
Next, the Whiteline Anti Lift kit is pressed in place. Don't put it in upside down or it will be the super lift kit!  The inner hole offset must be in the direction to cant the control arms forward to increase the positive caster.  Don't get that backwards!
The retaining clip is installed to hold the anti lift lit in place.
Here is what it looks like installed. 
Next the roll center correction balljoint is pressed in place.  Note how much longer the new balljoint shank is compared to stock. 
A little press action and it drops right in. 

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*