The Best of 2021, #2: Project 987.2 Cayman S, Aero Install With Verus Engineering

Next the side skirts were installed by putting anchor bolts into the factory holes in the rocker panel.

The skirts are also secured with double sided tape which is applied to the skirt with the backing removed before installation.

The side skirts are put onto the mounting bolts and pressed in place on the double stick tape.

Here are the side skits in postion and ready to be bolted down.

The nuts are hand tightened then final tightened with a socket with care taken not to overtighten. The side skirts are now installed.

Next is the installation of the air dam and splitter.  First the bumper is marked to give drilling locations for the airdam mounting holes. Next the holes are drilled.

7 comments

  1. I absolutely love this project. The shot of the undertray with the oil pan sitting perfectly flush is a testament to how well all these parts are engineered. I bet that thing is a riot on track.

  2. Been following this build from day 1, really impressed with the detail and how well through out the car is. I have the same car that I’m building out in a similar fashion and was wondering which roll bar you have in the car? Mine is white also, and I love the single bar through the rear window and the white powder coat.

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*